HurricaneLaw.Pro, Florida and South Carolina property insurance claim resource HURRICANELAW.PRO
HOME / DENIALS / THE ARCHIVE / UNDERWRITERS AT LLOYD'S, LONDON
47 FILINGS IN THE ARCHIVE

Underwriters at Lloyd's, London: the denial record

47 of the 1,891 Florida property claim-denial filings we read name this insurer. Here is what those filings describe and where to read each one.

How many Florida claim-denial filings name Underwriters at Lloyd's, London?

47 of the 1,891 Civil Remedy Notices over denied Florida property claims name Underwriters at Lloyd's, London. 9 were later withdrawn or recorded as resolved, which is what the record shows when a carrier fixes the problem inside the 60-day window. Counts follow book size as much as behaviour: a carrier with more Florida policies collects more filings.

Filings naming this insurer 47 of 1,891
Median repair figure named $219,186
Later withdrawn or resolved 9
Most common allegation The claim that never gets decided (39)
What these are Allegations by policyholders, not findings by a court
01WHAT THESE FILINGS DESCRIBE
The claim that never gets decided 39 The estimate that comes in low 27 The decision made without a real look 15 Storm damage called age 13 The retained engineer 12
02EVERY FILING, LARGEST FIGURE FIRST
Underwriters at Lloyd's, London Winter Haven Hurricane and wind 1/15/2025 $7,666,005

To cure the circumstances giving rise to the violations described in this notice, the Insurers must promptly tender $8,069,040.94 to [name redacted] minus the applicable deductible and prior payments.

Underwriters at Lloyd's, London Panama City Beach Hurricane and wind 2/11/2025 $1,281,119

The insurer declined to issue payment on the claim, based on the Insurers' determination that the repair costs were in the amount of $3,438.57, which was less than the policy deductible.

Underwriters at Lloyd's, London Saint James City Hurricane and wind 2/11/2025 $1,200,611

On December 6, 2022, the carrier made the unilateral determinations that the damages were covered would total to the amount of $860,887.44 for full repairs to the [name redacted] after to the application of the deductible and once the recoverable depreciation was fully recovered.

Underwriters at Lloyd's, London Pensacola Hurricane and wind 1/14/2025 $1,192,839

On 04/12/2022, the Insured's appraiser and the Umpire executed an Appraisal Award in the total amount of $1,192,839.23 RCV/$952,976.68 ACV in relation to the Claim, based on the Umpire's estimate.

Underwriters at Lloyd's, London Bartow Roof 11/4/2024 $1,129,565

On June 17, 2024, the public adjuster notified Underwriters of its involvement, on July 8, 2024, submitted an estimate for repairs along with photographs of the damages, and then on July 9 2024 submitted a Sworn Proof of Loss that totaled $1,124,547.66.

Underwriters at Lloyd's, London Saint Petersburg Hurricane and wind 2/24/2025 $657,419

Their estimate totaled a Building damage to $ 657,419.78 RCV, contents damages of $2,002.24 and Loss of Use damage, including repair time in the amount of $75,000.00.

Underwriters at Lloyd's, London Panama City Roof 6/18/2025 $462,240

Therefore, UNDERWRITERS should tender $462,240.10 (less any prior payments, depreciation, excess policy limits, and/or deductible) in insurance benefits at this time.

Underwriters at Lloyd's, London Fort Myers Beach Hurricane and wind 9/22/2024 $447,770

Lloyd's sent the Insured a letter dated May 23, 2023 in which Lloyd's presented its below deductible estimate to the Insured in the amount of $89,157.14.

Underwriters at Lloyd's, London Cape Coral Hurricane and wind 10/29/2024 $420,482

After assessing the damage and the true scope of repairs, the public adjuster prepared an estimate identifying $420,482.09 in covered damage to the dwelling, $5,745.45 in covered damage to other structures, and $18,408 for the screen enclosure special limit.

Underwriters at Lloyd's, London Tampa Hurricane and wind 2/10/2025 $373,397

Thereafter, Underwriters notified the Insured that because the amount of the replacement cost estimate was allegedly below the deductible, there was no claim payment to be made.

Underwriters at Lloyd's, London Panama City Hurricane and wind 11/26/2024 $350,000

The insurer has not conducted a good faith investigation of the claim and failed to arrive at a coverage determination on the claim after over four years.

Underwriters at Lloyd's, London Sanford Hurricane and wind 9/27/2024 $307,375

Gannon determined that at least $104,597.43 worth of building repairs would be required to return the property to its pre-loss condition as a result of the windstorm loss.

Underwriters at Lloyd's, London Treasure Island Hurricane and wind 3/17/2025 $277,270

LLOYD'S MADE NO PAYMENT AS THE ESTIMATE FELL BELOW THE POLICY'S DEDUCTIBLE OF $75,000.00.

Underwriters at Lloyd's, London Orlando Hurricane and wind 1/31/2025 $250,703

Through C.A.R.E., the Insureds submitted an itemized estimate of damages, dated November 18, 2024, totaling $250,703.16 in replacement cost value, reflecting the necessary expenses to restore the Insured Property to its pre-loss condition, including current prices of materials, labor, and permits in

Underwriters at Lloyd's, London Port Charlotte Fire 10/17/2024 $244,152

Subsequently, the insured submitted a loss package in the amount of $244,152.25 needed to restore the property back to its pre-loss condition to the carrier.

Underwriters at Lloyd's, London Santa Rosa Beach Business interruption 6/10/2025 $241,500

Subsequently, on March 25, 2024, the Insured obtained an itemized estimate of damages totaling $159,589.24 an amount that more accurately reflects the true scope and nature of the loss.

Underwriters at Lloyd's, London Windermere Hurricane and wind 2/25/2025 $234,372

However, the Insurer wrongfully determined that it would only require $16,169.20 to restore the insured property to its pre-loss condition, which failed to exceed the policy deductible.

Underwriters at Lloyd's, London Hallandale Beach Water damage 2/25/2025 $219,186

Subsequently, the insureds prepared a loss package in the amount of $219,186.98 needed to restore the property back to its pre-loss condition.

Underwriters at Lloyd's, London Winter Park Hurricane and wind 3/4/2025 $198,568

Following the loss, the insured retained RS Builders to perform mitigation repairs, where the insured incurred at least $67,561.94 in temporary repairs.

Underwriters at Lloyd's, London Hudson Hurricane and wind 2/25/2025 $194,908

Moreover, AVIVA determined that at least $194,908.87 worth of repairs would be required to return the property to its pre-loss condition as a result of the flood loss.

Underwriters at Lloyd's, London Fort Myers Hurricane and wind 6/3/2025 WITHDRAWN OR RESOLVED $188,914

On or about January 23, 2023, the Insurers issued a coverage determination letter, making an advance on the building settlement for the loss to the Property in the amount of $100,000.00.

Underwriters at Lloyd's, London Sarasota Hurricane and wind 10/20/2024 WITHDRAWN OR RESOLVED $185,065

Upon information and belief, Carrier deliberately kept its coverage estimate dated December 1, 2022 under the $20,000.00 deductible to avoid paying out any money on the claim.

Underwriters at Lloyd's, London Hudson Hurricane and wind 2/25/2025 $182,562

Moreover, AVIVA determined that at least $47,153.36 worth of repairs would be required to return the property to its pre-loss condition as a result of the flood loss.

Underwriters at Lloyd's, London Water damage 1/31/2025 WITHDRAWN OR RESOLVED $167,938

Subsequently, the claimant prepared a loss package in the amount of $ 167,938.18 needed to restore the property back to its pre-loss condition.

Underwriters at Lloyd's, London St. Pete Beach Hurricane and wind 3/17/2025 $167,382

Therefore, demand is hereby made as follows: Estimate $167,382.05 Less Prior Payments $20,116.77 Less Deductible $37,207.40 TOTAL $135,162.37 The concept of insurance is that the insurer will investigate and grant timely and prompt indemnity or security against a contingent loss.

Underwriters at Lloyd's, London Palmetto Hurricane and wind 3/6/2025 WITHDRAWN OR RESOLVED $114,697

Storm One prepared an estimate in the amount of $114,697.[address redacted]ease find a copy of Storm One's estimate along with photos taken of the loss.

Underwriters at Lloyd's, London Sebring Hurricane and wind 12/4/2024 WITHDRAWN OR RESOLVED $111,657

As the Insurer has failed to make a timely determination, it has violated this code.

Underwriters at Lloyd's, London Tampa Hurricane and wind 5/20/2025 $91,296

Specifically, the Insured, with assistance from their public adjuster, submitted an estimate for $91,296.56, which was a fair and reasonable assessment for the repair/replacement of damages.

Underwriters at Lloyd's, London Avon Park Hurricane and wind 11/5/2024 $53,120

Thereafter, the insurer offered in total (including recoverable depreciation) the amount of $61,874.04.

Underwriters at Lloyd's, London Panama City 1/15/2025 $50,792

Therefore, UNDERWRITERS should tender $1,577,343.75 (less any prior payments, depreciation, excess policy limits, and/or deductible) in insurance benefits at this time.

Underwriters at Lloyd's, London Anna Maria Water damage 11/26/2024 WITHDRAWN OR RESOLVED $45,475

Subsequently, the insureds prepared a loss package in the amount of $45,475.00 needed to restore the property back to its pre-loss condition.

Underwriters at Lloyd's, London Saint Cloud Hurricane and wind 11/14/2024 WITHDRAWN OR RESOLVED $45,372

Therefore, to cure the defects outlined in this Civil Remedy Notice, the carrier must: 1.) Pay the complete covered loss in the amount of $45,372.20 (after application of the deductible) 2.) Pay the statutory interest on the amount of unpaid damages from the date the loss was reported to the date pa

Underwriters at Lloyd's, London Seminole Hurricane and wind 5/23/2025 WITHDRAWN OR RESOLVED $24,000

This is demonstrably false: the Insured provided access, documentation, ongoing photos, roofing contact information, mitigation invoices, and responsive communications while the [name redacted] failed to respond substantively to the March 18, 2025 demand or pay approved mitigation costs totaling now

Underwriters at Lloyd's, London Sarasota Water damage 1/17/2025 $2,743

The water bills then progressively dropped in July ($2,743.00) and August ($868.56).

Underwriters at Lloyd's, London Navarre Hurricane and wind 10/8/2024 $2,362

The field adjuster created an estimate dated January 26, 2021, for $2,362.29, which failed to exceed the policy deductible.

Underwriters at Lloyd's, London Jacksonville Hurricane and wind 1/20/2025

During the course of Underwriters' investigation, the Insured made her property available for inspection, provided facts and information about the loss, and complied with Underwriters' adjustment of the claim.

Underwriters at Lloyd's, London Live Oak 2/11/2025 WITHDRAWN OR RESOLVED

On December 18, 2024, the Public Adjuster representing the insured submitted a signed Sworn Proof of Loss, an estimate, and a written appraisal demand to the insurer.

Underwriters at Lloyd's, London Pensacola Hurricane and wind 10/21/2024

Carrier inspected the property and acknowledged coverage for the loss but underpaid the claim by only issuing a payment of $1,317.82 after application of the $7,500 windstorm deductible.

Underwriters at Lloyd's, London Hialeah Business interruption 12/19/2024

The insurer, in bad faith, has raised defenses to paying the full value of the claim that the insurer knows are inapplicable to the subject loss and which the insurer's own experts do not agree with based upon a plain reading of the expert's reports.

Underwriters at Lloyd's, London Panama City Beach Hurricane and wind 1/27/2025

The letter also incorrectly stated that the Insurers remained liable for only $18,598,332 of that $25 million because they had paid their proportionate share of $5 million pursuant to the non-cash agreement and $1,401,668 had already been paid toward code-related rebuilding.

Underwriters at Lloyd's, London Cross Plains Hurricane and wind 2/10/2025

The insured disputes the entirety of the denial letter of July 5, 2024, including the co-insurance penalty being applied and including the insuror's allegation that the requested repairs were somehow "excessive".

Underwriters at Lloyd's, London Haines City Hurricane and wind 2/28/2025

The Carrier performed a cursory inspection of the Insured Property and failed to retain unbiased experts necessary to scope the entirety of the Loss and covered repairs necessary to restore the Insured Property to its pre-loss condition.

Underwriters at Lloyd's, London Port Charlotte Hurricane and wind 3/14/2025

The Carrier performed a cursory inspection of the Insured Property and failed to retain unbiased experts necessary to scope the entirety of the Loss and covered repairs necessary to restore the Insured Property to its pre-loss condition.

Underwriters at Lloyd's, London Panama City Beach Hurricane and wind 3/20/2025

Ironshore's and Oil Casualty's exposures for this claim arise when the total payments to all insureds exceed $25,000,000.

Underwriters at Lloyd's, London Opa Locka Theft and vandalism 3/21/2025

Following this inspection, Lloyd's failed to timely communicate a coverage determination or request any additional documents necessary for concluding its investigation.

Underwriters at Lloyd's, London Orlando Hurricane and wind 5/20/2025

The Carrier performed a cursory inspection of the Insured Property and failed to retain unbiased experts necessary to trigger the cause of the Loss and covered repairs necessary to restore the Insured Property to its pre-loss condition.

Underwriters at Lloyd's, London Tarpon Springs Hurricane and wind 6/4/2025

The Insured promptly reported the loss to Insurer, mitigated the damages, complied with all applicable post-loss obligations, and retained a public adjuster to assist through this difficult time.

Each row is a complaint filed by a policyholder against an insurer. The figure is the largest amount the filing names, usually an independent estimate of the repair. Nothing here is a finding by a court or by the Department.