How much is a My Safe Florida Home grant?
The state pays $2 for every $1 you pay, up to a maximum state contribution of $10,000, so a $15,000 project draws the full grant and costs you $5,000. Low-income homeowners can receive up to $10,000 with no match. Fla. Stat. 215.5586 sets both figures.
| Match ratio | $1 from you, $2 from the state |
|---|---|
| Maximum state share | $10,000 |
| Low-income track | Up to $10,000, no match, no paid-in-full invoice |
| Funded upgrades | Opening protection, roof-to-wall, roof deck, secondary water resistance |
| Paid | As reimbursement after the work, by draw request |
THE GRANT, IN FIVE LINES
- • Matching grant: the state pays $2 for every $1 you pay, capped at a $10,000 state contribution.
- • Low-income applicants: up to $10,000, no match required, no paid-in-full invoice required.
- • Four funded upgrades only: opening protection, roof-to-wall attachment, roof deck attachment, secondary water resistance.
- • Hard gates: insured value $700,000 or less, home built before January 1, 2008, initial inspection through the program within the 24 months before you apply.
- • An inspection does not guarantee a grant. The program says so outright, and funding is subject to annual appropriation.
The match math, in three lines
Fla. Stat. 215.5586 writes it plainly: all grants must be matched on the basis of $1 provided by the applicant for $2 provided by the state, up to a maximum state contribution of $10,000. That means the sweet spot is a project that costs about $15,000. Below it, the ratio governs. Above it, the cap governs and the overage is entirely yours.
| PROJECT COST | STATE PAYS | YOU PAY | WHY |
|---|---|---|---|
| $9,000 | $6,000 | $3,000 | Under the cap. The 2-to-1 ratio governs, so the state covers two thirds. |
| $15,000 | $10,000 | $5,000 | Exactly at the cap. $10,000 is the most the state will contribute. |
| $20,000 | $10,000 | $10,000 | Over the cap. Every dollar above $15,000 of project cost is yours alone. |
The low-income track works differently. Low-income homeowners as defined in Fla. Stat. 420.0004 are eligible for up to $10,000 with no matching contribution, and the program does not require them to produce a paid-in-full invoice at the draw request. Everything else, including the approval-before- construction rule, still applies.
The four improvements grant money touches
Four, and only four. And the gate is doubled: an improvement has to be recommended in your Initial Inspection Report and then observed in the Final Inspection Report to be funded. The program states that no other construction work will be considered, and that funding for projects completed before a grant application is approved will be denied.
Opening protection
Impact-resistant windows, doors, garage doors and skylights, to keep flying debris from breaching the building envelope. A single broken opening pressurizes the house and is how roofs come off from the inside.
Roof-to-wall attachment
Clips or wraps that tie the trusses and rafters to the wall top plate. The upgrade path runs from toe nails, which is the weakest connection the state form recognizes, up to straps that wrap the framing.
Roof deck attachment
Renailing the sheathing to the trusses and rafters to a stronger schedule. Larger nails at tighter spacing, which is one of the cheapest uplift improvements available when the roof is already open.
Secondary water resistance
A self-adhering polymer modified-bitumen underlayment applied directly to the sheathing, so the house keeps out water even after the roof covering is gone. Standard underlayment and hot-mopped felt do not qualify.
Two rules from the program support center, read November 8, 2026, narrow what each improvement pays for. Roof covering: replacement costs are eligible when replacing the covering is necessary to complete a roof-to-wall, roof deck or secondary water resistance improvement, and only when the entire pitched roof, the entire flat roof, or both are replaced; patching and partial roof repairs are not funded (support center ↗). Opening protection: only the openings the initial report recommends are funded, and the grant cannot exchange one type of compliant protection for another, such as shutters for impact windows (support center ↗).
Townhouses changed in 2026. The 2025 text of Fla. Stat. 215.5586 ↗ limited townhouse grants to opening protection. The 2026 text ↗ drops that limit and makes a detached home, or an attached home of no more than three stories, eligible for the inspection. The Florida Senate records Senate Bill 1452 as approved by the Governor on June 26, 2026, as chapter 2026-174 ↗. The program FAQ ↗, read November 8, 2026, still says SB 1452 "once signed" will let townhomes receive roof improvement grants, and that single-family homes attached to other units are treated as townhouses. Confirm the current rule at mysafeflhome.com ↗ before you plan a townhouse project. What each of these features means on the inspection form is covered on the wind mitigation inspection page.
Five questions that decide the grant
The free inspection has a short eligibility test. The grant has a longer one, and the program is explicit that not all applicants who received an inspection will be eligible for a grant.
Has the home had an initial inspection through the program in the last 24 months?
Required: the 2026 text of Fla. Stat. 215.5586 counts only a program inspection within the 24 months before the grant application. A private wind mitigation inspection does not count, and you cannot use your own inspector: the program assigns one it contracts with.
Is the insured value $700,000 or less?
The dwelling must be insured for $700,000 or less. Fla. Stat. 215.5586 sets the figure.
Was the home built before January 1, 2008?
As reflected on the county property appraiser website. Homes built from 2008 forward are outside the grant, though they can still take the free inspection.
Does the household meet the income definition?
The 2026 statute requires a grant applicant to be a low-income or moderate-income person as defined in Fla. Stat. 420.0004, and the program queues applicants by income and age. Low income is at or below 80% of the county median as HUD counts it; moderate is below 120%.
Can you name a licensed contractor and open the house for a final inspection?
Both are conditions of the grant application, along with agreeing to report back whatever premium discount your insurer gives you once the work is done.
You pick the contractor, and you own that choice
You may use any licensed Florida contractor. The license has to be certified or registered with the Department of Business and Professional Regulation as a general, building, residential, specialty or roofing contractor, and the program verifies it before approving the grant. Check the license yourself at myfloridalicense.com ↗ before you type it into the portal.
Two things follow from that, and the program says both out loud. It no longer maintains a list of authorized contractors, so anyone claiming to be "program approved" is selling you something. And it disclaims responsibility for the work: disputes over construction or payment are between you and your contractor, with no warranty or guarantee from the program or the Department of Financial Services.
The program recommends getting bids from at least three contractors before you commit. The grant is capped, the project is not, and the difference lands on you.
Why do My Safe Florida Home grants wait in a queue?
The program is funded by annual legislative appropriation, and the statute requires the department to keep the total funding requested by accepted applications within the funds available. Applications open in phases by priority group: under Fla. Stat. 215.5586 the program starts with low-income homeowners aged 60 and older, opens other low-income applicants 15 days later, moderate-income applicants aged 60 and older at 30 days, and other moderate-income applicants at 45 days. As of November 8, 2026 the program FAQ ↗ says the phased schedule is to be determined and tells applicants to watch the site for opening dates.
The support center says an applicant who indicates interest in a grant is sorted into a Grant Group, subject to appropriation and available funds. If funding is not available, or the group is not yet allowed to apply, the applicant gets access to the grant application when or if it becomes available (support center ↗). Four rules end applications:
- Approval first. Beginning construction before the official grant approval notice disqualifies the reimbursement.
- 60 days to respond. Under the 2026 text of Fla. Stat. 215.5586, an application is deemed abandoned if the department does not receive a response to its request for more information within 60 days. The department must notify you at least 5 business days before an application is deemed abandoned.
- 18 months to build. Construction has to be complete and the final inspection requested within 18 months of grant approval, or the application is deemed abandoned and the funds revert.
- One final inspection request. You get exactly one, so do not request it until permits are approved and closed and the work is finished.
A grant application needs a program inspection from the 24 months before you apply. If more than 24 months have passed since your last inspection with no grant payment, the statute and the program allow a new inspection application. An applicant who already had a program inspection completes the Prioritization Questionnaire in MSFH 1.0 to be sorted into a Grant Group (support center ↗).
The draw request
The grant is a reimbursement. Nothing arrives until the work is done, the permits are closed, the final inspection is passed, and the paperwork is complete. The program asks for the draw request summary, the original contractor invoice, proof of payment in full, proof of the insurance premium discounts you received, and disbursement details. Low-income grantees are not required to produce the paid-in-full invoice. Approved draws are paid by check in the mail.
One step in that list is doing double duty for you: submit the Final Inspection Report to your insurer. That is the document that converts the construction into a premium credit, and the program requires you to report the resulting discount back to it. Keep a copy for your own file, because the same report is evidence of your home's condition if you ever have to argue a claim. That argument is laid out on the inspection page and in wear and tear vs. wind damage. Store it with the rest of the pre-storm file, covered in before the storm.
Grant questions, answered
How much is a My Safe Florida Home grant? +
The state contributes $2 for every $1 the homeowner contributes, up to a maximum state contribution of $10,000. So a $15,000 project draws the full $10,000 and costs you $5,000. Low-income homeowners are eligible for up to $10,000 with no matching contribution required. Fla. Stat. 215.5586 sets both figures.
Can I start the work before the grant is approved? +
No, and this is where most of the lost money goes. The program states that beginning mitigation construction before you receive your official grant approval notice will disqualify you from reimbursement. Wait for the written approval, then schedule the contractor.
Does the grant pay for a whole new roof? +
Only as part of a roof improvement. Grant funding covers four improvements when the Initial Inspection Report recommends them: opening protection, roof-to-wall attachment, roof deck attachment, and secondary water resistance. As of November 8, 2026 the program support center says roof covering replacement costs are eligible when replacing the covering is necessary to complete a roof-to-wall, roof deck or secondary water resistance improvement, and only when the entire pitched roof, the entire flat roof, or both are replaced. A new covering without one of those improvements, a patch or a partial repair is not funded.
Does the program pick my contractor? +
No. You choose any licensed Florida contractor whose license is certified or registered with the Department of Business and Professional Regulation as a general, building, residential, specialty or roofing contractor. The program no longer maintains a list of authorized contractors and takes no responsibility for the selection, the construction or the payment. Verify the license at MyFloridaLicense.com first.
I had an inspection but never got a grant. Am I still in line? +
Applications are prioritized by income and age and open in phases. As of November 8, 2026 the program support center says applicants who already had a program inspection complete the Prioritization Questionnaire in MSFH 1.0 to be sorted into a Grant Group, and get access to the grant application when or if funding becomes available. A grant application needs a program inspection from the 24 months before you apply. A new inspection application is allowed when more than 24 months have passed since the last inspection without a grant payment.
- My Safe Florida Home, official program site and FAQ (grant types, match examples, funded improvements, contractor rules, draw request, timelines, townhome note) · read November 8, 2026 · mysafeflhome.com ↗ · FAQ ↗
- My Safe Florida Home support center (roof covering, opening protection, grant indication of interest, MSFH 1.0 and 2.0) · read November 8, 2026 · roof ↗ · improvements ↗ · grant interest ↗ · 1.0 vs 2.0 ↗
- Fla. Stat. 215.5586, 2026 Florida Statutes (grant match, $10,000 cap, $700,000 insured value, built before 2008, 24-month inspection, priority order, 60-day and 5-business-day abandonment rules) · read November 8, 2026 · flsenate.gov ↗ · 2025 text (townhouse opening-protection limit) · flsenate.gov ↗
- Senate Bill 1452 (2026), approved by the Governor June 26, 2026, chapter 2026-174 · flsenate.gov ↗
- Fla. Stat. 420.0004 (low-income and moderate-income definitions) · flsenate.gov ↗
- Florida DBPR contractor license lookup · myfloridalicense.com ↗
Grant amounts, priority groups and application windows depend on the annual state appropriation and were read from the official program site and its support center on November 8, 2026; confirm current terms at mysafeflhome.com before acting. Fla. Stat. 215.5586 read from the 2026 Florida Statutes on November 8, 2026; other statute summaries as of August 2026, simplified; verify against current statute. Not legal advice; consult an attorney about your specific claim.
Mitigated the house and still got denied?
Send the denial letter and your mitigation paperwork. You'll get a straight answer on what the carrier is arguing, what your inspection reports actually prove, and what the strongest next move is.